Environmental protection products are how a consented scheme keeps its promises: silt curtains and turbidity barriers holding disturbed sediment inside the works, spill containment protecting watercourses from plant and fuel, and water-quality monitoring kit proving compliance in data the regulator will accept. EMIS specifies each product to the consent condition it exists to satisfy, then holds the evidence trail ready. On a consented scheme, the paperwork is part of the product.
Most environmental consents say the same things in different words: contain what you disturb, contain what you might spill, and measure what leaves the site. Silt curtains and turbidity barriers answer the first, floating geotextile screens moored around in-water works so disturbed sediment settles inside the curtain instead of drifting over a protected habitat. Their specification depends on water depth, current, tidal range and how long the curtain must survive on station.
Spill containment answers the second: bunds and drip trays under static plant, booms and absorbents staged for response, and fuel storage that meets the regulations before the first refuelling. Where a site or harbour needs dedicated response capability, deployable boom systems and oil skimmers rather than compliance staging, our Oil Spill Response & Containment category covers it. Water-quality monitoring answers the third: turbidity, dissolved oxygen and pH instruments deployed up- and downstream of the works, logging the evidence that conditions were met, with calibration records that make the data defensible.
EMIS works from the consent, the environmental management plan and the method statement, maps each product to the condition it satisfies, and sources the package from vetted suppliers, with calibration certificates, material data and deployment documentation gathered as we buy. When the regulator visits, the evidence is a file, not a scramble.
The project types and sectors this category most often serves.
Marine licences routinely condition turbidity at the works boundary. EMIS specifies silt curtains to the depth, current and season, with monitoring kit deployed to prove the condition is met.
Schemes beside designated habitats carry tight containment and monitoring obligations. We map the product package to the consent so every condition has a product and a record against it.
Pipeline and cable crossings need spill containment, booms and monitoring staged before works start. EMIS delivers the package ready for the environmental clerk of works to sign off.
Government schemes need environmental compliance demonstrated in auditable form. We hold calibration and deployment records so the compliance file stands up to scrutiny.
Vetting, specification and lead-time coordination, handled before the product reaches your site.
Each product is mapped to the consent condition it satisfies, curtain to turbidity limit, containment to pollution prevention, instrument to monitoring obligation, so nothing is generic.
Calibration certificates, material data and deployment documentation are collected at sourcing, so the regulator sees a complete file rather than a reconstruction.
Containment and monitoring must be in place before the first disturbance. We coordinate delivery so the package is deployed and signed off ahead of the works, not chasing them.
Typical performance characteristics, full specifications are provided at quotation.
| Silt curtains | Floating turbidity barriers for still, tidal and flowing water, moored to suit current and depth |
|---|---|
| Spill containment | Bunds, drip trays, booms, absorbents and compliant fuel storage |
| Monitoring kit | Turbidity, dissolved oxygen and pH instruments with logging and calibration records |
See the typical requirements we support, the challenges we help manage, and the ten-step process behind every engagement.
Tell us the requirement and the programme. You will get a specified, priced package from one accountable contact, with the category already selected on the form.
We respond to all enquiries within one business day.